5.
Fig.19: Fig.23:
Delta connection
The bridges are carried out as
shown the wiring diagram. 5.
The star connection is
embedded the female
connector. 5.21:
All motor coils and bridges for
the brake and temperature
detecting element are
terminated the connector.22:
Star connection
The bridges are carried out as
shown the wiring diagram.
Fig.
.20:
Connector insert with bridges for delta Connector with bridges for star
connection motor connection motor
5.186
Fig. 5.
This done directly via
motor terminal box. 5.
Fig.
The delta connection is
embedded the female
connector.1.5 Contact Arrangements
The contact assignment for the most important motor bridges was specified
in cooperation with motor manufacturers and users