Although most testing batteries went the small test department the top
floor Building battery testing was also done Building and this can be
illustrated with surviving equipment. These items can used interpreting spaces
on the second floor Building show Edison’s involvement recording. this played critical part the storage battery campaign, evidence
of these activities are also included the furnishings plan.
The storage battery campaign was also centered Building and Building 2.
180
.recorded his evaluations survive.
One element the West Orange laboratory’s work that has not been emphasized
in the interpretation the Edison laboratory the routine testing and analysis of
materials.
The perfection the storage battery required the close cooperation chemical
and mechanical expertise: the chemistry laboratory was used for compiling,
analyzing, and improving the electrolyte and the materials used the battery,
while the machine shops produced the special machines make batteries