Information and Communication technology, Safety cable systems, Building automation, Elevator cable systems, Cable harnessing, logistics and support
Strana 466 z 528
Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.
Poznámky redaktora
1
See Fig. 14,8 14,8 14,8 14,8 Length app.ecobus® Patch
Pre- assembled cables
Building Systems Technology
Fig. 1000 2000 3000 4000 Fire load kWh/unit 2,52 4,04 5,56 7,08 Packaging Unit pcs. cross section 0,8 0,8 Diameter app. 20-30 Sheath length: insulation length: mm
General Properties
Connectors Actuators
See Fig. cross section mm2 2,5 0,8 2,5 0,8 2,5 0,8 Diameter app.4: ecobus® Patch 0,8 connection cable plug
Product information
Cables
Application
Used connect ecobus® Combi and ecobus® Data sockets the ecobus® Combi and ecobus® Data cables quickly. ecobus® Patch Connection cable
Article No. 6,0 6,0 Length app.
EIB/KNX European Installation Bus
.2: ecobus® Patch 2,5 0,8 pole connection cable plug
Fig. cross section mm2 2,5 0,8 2,5 0,8 2,5 0,8 2,5 0,8 Diameter app. ecobus® Patch MCF Connection cable Extension
Article No. 18,8 18,8 18,8 18,8 Length app. 1
E-32
Technical changes reserved. 1300 552 1300 553 For nom. 1000 2000 3000 7000 Fire load kWh/unit 1,17 2,00 2,83 6,15 Packaging Unit pcs.3: ecobus® Patch 2,5 0,8 MCF connection cable for ecobus® office actuator pole Bus MCF Extension
Fig. 30-40 Removal load app. 1300 531 1300 532 1300 533 1301 229 For nom. cross section mm2 1,5 0,8 1,5 0,8 1,5 0,8 1,5 0,8 Diameter app. 1300 541 1300 542 1300 543 For nom. ecobus® Patch Connection cable
Article No. 1000 2000 3000 Fire load kWh/unit 2,02 3,54 5,06 Packaging Unit pcs. 18,8 18,8 18,8 Length app. 2000 3000 Fire load kWh/unit 0,54 0,69 Packaging Unit pcs. 1
See Fig. 1301 112 1301 113 1301 114 1301 115 For nom.1: ecobus® Patch 1,5 0,8 pole connection cable plug
Fig. Nominal voltage (data) Nominal current (data) Cable (data) Cable type Cable cross section Push cycles (Power) Insertion/removal load Amount free cable ends Cable based DIN VDE 0815 Similar I-Y(St)Y See table Inserting and removing under full load, DIN VDE 0625 around 50-100 insertions with For 200 insertion cycles each: Insertion load app. 1
Accessories
See Fig. ecobus® Patch Connection cable
Informations
Article No