A 6116 F205
Testing the diffusion heat room
(walls, floors, Ceilings)
Comprehensive testing electrical installation safety
> Page Checking inrush current Page 102
> Page 115
C. ontinuity measurement (test 200 mA) Check that the ground conductor good condition and connected well the earth.A 871
Portable, on-site and laboratory test and measurement instruments 2012 catalogue
Page 9
.A 6030 C. nsulation measurement between conductors and the entire Installation relation the earth For installation with nominal voltage 230 Vac, inject 500 Vdc and find the resistance 0. This measurement carried out noncurrent-carrying installations. Find ifferentials working correctly They should trip for current their nominal current and within 300 ms.
V 100 F01/F03
> Page Measuring current
age 89
erification solar-power nstallations
C. French Labour Code makes mandatory use VAT (instrument compliant with IEC 61243-3) for any work requiring isolation equipment.See the index our products page 160
Reminders
> IEE 16th regulation imposes the following tests: Earth Measurement The earth rod should have resistance <100 allow current flow the earth.A 745
> Pages 14-15 Determining the phase
C.A 8335
> Pages 86-87 Energy quality testing Pages 42-43
Connection tightening check
(prevents fire hazard)
C.A 5205G
Measuring voltage
> Page 25
> Page RCD tests
+
C.A 1864
> Page 103
C.5 MΩ