The use of innovations and new technologies at Hageris always customer-driven. Every year, Hager evaluatesthousands of its customer contacts, resulting in detailedknowledge of its customers’needs in order to workefficiently and successfully.
Poznámky redaktora
f.
- rooms with more than one door stairwells the lighting should operable from least two points.
12) For usable areas greater than m2. Access paths, building main doors
including doorbell panels and steps, must adequately lit.
11) Switchable from two positions.T32
Living room 3)
Without dining area 1
1 1
4 1
1 1
8 2
1 2
1 2
With dining area 4
1
5
2
Dining area/ 12m2 1
room 3
Kitchen 4)5)19)
Without breakfast bar 2
- -
10 3
- 4
1 1
With breakfast bar 5
2 -
7 5
DIY room 4)5) 3
Hobby room
3 -
3
1 -
5
2 2
- -
1-or 8m2 5
1 6
2 Bedroom 1
Parent/child 2
Bath 5)6)7)8) 2
- -
4 3
- 4
- -
WC 5)6)8)9) 1
- -
1 2
Corridor Length 2.
- Power sockets installed the open air should protected against unauthorised use, e.
- the number sockets, outlets and connections increased, the number circuits must also increased.
10) Switchable from one position. They are classified according the table 1gang sockets.
13) Does not apply cellar and basement rooms formed grille type partitions, e. 9
Sub-circuit distribution board 2-series 2-series 3-series 4-series
Equipment circuit
1) junction boxes for consumer equipment below kW.
15) For usable areas greater than m2, two lights. Light systems for stairwells, lift areas apartment blocks
and lobbies should fitted with programmable automatic cut-outs. The switches and push-buttons these rooms must identifiable darkness, e. means built-in lamp.
8) windowless bathrooms WCs, delayed-off fan via the general room lighting.
9) WCs with washbasin wall socket.
7) which one socket/outlet for one heater.
- rooms for special uses, such hobby rooms, separate circuits should configured for lighting and wall sockets where appropriate.5 11)
1
1
1 1
2
2
3
Outdoor seating Width m
112)
1 1
Loggia
Width 112) -
Terrace 1
2 2
Store room above -
Adjoining cellar/basement 13) -
Communal cellar/basement 114) 115) 114) 115) 114) 115) 114) 115) -
Cellar corridor basement corridor 116) 116) 116) 116) -
Bell/gong 1
Door opening system 1
Intercom system 117) 117)
Alarm system (GMA) 118)
Lighting and socket outlet circuit 50m2=3, plus 25m2 p.
18) detached and semi-detached houses. lock mechanism cut-out.V.
- doorbell must provided for each dwelling, for buildings with more than two dwellings door opening system should also fitted conjunction with an
intercom.
19) For rooms with dining alcoves the number outlets and sockets should each increased 1.
17) With multiple internal communication points.g.
1)20) 2)3) 2)3) 2)3) 2)3)
E
E
Key
SCHUKO socket
Light, general
Telecoms socket
Aerial socket
Electric hob
Built-in electric hob
Built-in oven
Refrigerator
Freezer
Fridge/freezer
Dishwasher
Washing machine
Washer-drier
Hot water heater
if other hot water
supply
Electrical appliances,
general
[ ]
[ ]
[ ]
[ ]
Tronic dimming transformers
. They each count however according the table one outlet.
4) The working areas should illuminated avoid far possible shadowing glare. (Central Advisory
Office for Electricity Applications)
Equipment category Equipment category Equipment category 3
Extracts from DIN 18015
part 2:
As matter principle, residential buildings shall always conform least equipment category This corresponds the current minimum requirements for needs-based
electrical installation.g.
16) corridors above length one outlet per section part thereof.
Balcony
E
HEA (revised), Hauptberatungsstelle für
Elektrizitätsanwendungen e. wire mesh. also applies Instabus EIB installations residential buildings.
- telephone wall socket should combined with the aerial sockets.
6) One which permitted combined with the light over the washbasin; bathrooms only outlet over
the washbasin.
20) Sockets bedheads, working surfaces kitchens, cooking alcoves and utility rooms, together with sockets connection units
for telecommunications should least 2gang socket combinations; those alongside aerial sockets should least 3gang
socket combinations.g.
14) For aerial amplifiers, required only once per aerial system.
5) Additionally outlet for fan/extractor unit, individual room ventilation provided.5 10) 1
- -
1
1 2
3 -
Hallway Length 2. avoid sudden darkness, the automatic cut-out must provide warning,
such dimming.
- permit subsequent deployment Instabus EIB, recommended install ready made-up bus cable unoccupied conduit system during electrical
installation.
- electric doors, gates, blinds and shutters are installed, the number circuits must increased.
2) For more than rooms aerial sockets, more than rooms aerial sockets.
- Cellar and basement rooms forming part the dwelling must protected additional circuits.
3) The sockets assigned the beds must configured least 2gang sockets, the sockets next aerial sockets must be
configured least 3gang sockets. there permanent lighting hours darkness, additional facilities
such controllers comparable automatic switching devices should fitted