Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...
Poznámky redaktora
.. case negative connection test (e.... means of
the "Search Field"...
Untick the box "Display All" and enter the corresponding date the field
"NextTest" means ofthe calendarfunction.BENNING BENNING 750 A
12. The measuring
data will stored the selected database (name) and can read out via PC. arrying the Integrated tic Test
Test samples already existing database can tested rapidly means the automatic test.1 earch Test ples
Automatic Test
Database
--------------------,
|Alfbns New Test Sample |
Customer
|Hartmann _▼]
ly Display All
ID no....).. The result shown the fields "No.
12.
Attention! The mains voltage applied the test sample will persist during the "Test interrupted" mes
sage! Incorrect measured values can deleted pressing the ese button.g..... After pressing atic Test> the start menu, select the
following the menu displayed:
- Selection the database (name), only specific customers!
- Selection the customer (name), only specific test samples!
- Selection the test sample (ID no. possible display the
results pressing alu and save them pressing >)...g." line and mark means the input stylus. the no. ofTest Samples" and
"ID no.. pressing the button, possible interrupt measurement that e.
Now, the menu the selected test sample opens.
The sequence described here applies already existing database (name), customer (name)
with registered test samples (ID no.. In
case faulty individual results that are dangerous, the measurement will interrupted immediate
ly.. Next test
Ili. The individual tests (depending the pre-set
ting the test procedure) are displayed subsequently and partly have activated confirmed
by pressing the rt> button (also see description the individual measuring types, chapter 8).
open switch), information message displayed..), depending the customer database!
- Select the test sample the "ID no. The values are highlighted grey colour and
cannot modified this menu! After pressing the rt> button, first the "Visual Inspection"
menu displayed. After the test has
been successful and finished, the "Test sample OK" menu displayed. |29/06/2010 LlJ
No..... After positive test and pressing button, a
connection test started. The test intended determine whether dangerous contact voltage
is applied, whether test sample connected and make sure that there short-circuit.... After
a positive connection test, the measurement started....g.
08/ 2012 58
... possible filter and search for different parameters like e. the test cable
with the alligator clip probe tip can connected another measuring point without resulting in
incorrect measurements indications..... Test ||2 Search Field
of ||2 1
Back Database Input About |
By means the fields "Display All" and "Next Test", you can select the test samples a
specific "Database" and the corresponding "Customer" which shall tested specific date.".... Confirm pressing button