Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...
Poznámky redaktora
The values are highlighted grey colour and
cannot modified this menu! After pressing the rt> button, first the "Visual Inspection"
menu displayed..g...).
12. possible display the
results pressing alu and save them pressing >)... Next test
Ili.g.....BENNING BENNING 750 A
12.1 earch Test ples
Automatic Test
Database
--------------------,
|Alfbns New Test Sample |
Customer
|Hartmann _▼]
ly Display All
ID no. Test ||2 Search Field
of ||2 1
Back Database Input About |
By means the fields "Display All" and "Next Test", you can select the test samples a
specific "Database" and the corresponding "Customer" which shall tested specific date..
Untick the box "Display All" and enter the corresponding date the field
"NextTest" means ofthe calendarfunction. ofTest Samples" and
"ID no..
Now, the menu the selected test sample opens..... The measuring
data will stored the selected database (name) and can read out via PC.. The result shown the fields "No..... After the test has
been successful and finished, the "Test sample OK" menu displayed......
The sequence described here applies already existing database (name), customer (name)
with registered test samples (ID no.". the test cable
with the alligator clip probe tip can connected another measuring point without resulting in
incorrect measurements indications... After positive test and pressing button, a
connection test started. In
case faulty individual results that are dangerous, the measurement will interrupted immediate
ly. Confirm pressing button.. After pressing atic Test> the start menu, select the
following the menu displayed:
- Selection the database (name), only specific customers!
- Selection the customer (name), only specific test samples!
- Selection the test sample (ID no... The individual tests (depending the pre-set
ting the test procedure) are displayed subsequently and partly have activated confirmed
by pressing the rt> button (also see description the individual measuring types, chapter 8). the no. case negative connection test (e.. pressing the button, possible interrupt measurement that e.
08/ 2012 58
..), depending the customer database!
- Select the test sample the "ID no.
open switch), information message displayed..." line and mark means the input stylus.. After
a positive connection test, the measurement started. |29/06/2010 LlJ
No... The test intended determine whether dangerous contact voltage
is applied, whether test sample connected and make sure that there short-circuit.. possible filter and search for different parameters like e.
Attention! The mains voltage applied the test sample will persist during the "Test interrupted" mes
sage! Incorrect measured values can deleted pressing the ese button. arrying the Integrated tic Test
Test samples already existing database can tested rapidly means the automatic test.g.. means of
the "Search Field".