BENNING produkty

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...

Vydal: BENNING CR, s.r.o. Autor: BENNING

Strana 223 z 247

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
.... The individual tests (depending the pre-set­ ting the test procedure) are displayed subsequently and partly have activated confirmed by pressing the rt> button (also see description the individual measuring types, chapter 8).BENNING BENNING 750 A 12. Next test Ili..g..... arrying the Integrated tic Test Test samples already existing database can tested rapidly means the automatic test..g.".g. |29/06/2010 LlJ No. Attention! The mains voltage applied the test sample will persist during the "Test interrupted" mes­ sage! Incorrect measured values can deleted pressing the ese button. possible filter and search for different parameters like e.. Test ||2 Search Field of ||2 1 Back Database Input About | By means the fields "Display All" and "Next Test", you can select the test samples a specific "Database" and the corresponding "Customer" which shall tested specific date.. 12. case negative connection test (e. The test intended determine whether dangerous contact voltage is applied, whether test sample connected and make sure that there short-circuit. the test cable with the alligator clip probe tip can connected another measuring point without resulting in incorrect measurements indications.. After pressing atic Test> the start menu, select the following the menu displayed: - Selection the database (name), only specific customers! - Selection the customer (name), only specific test samples! - Selection the test sample (ID no. After positive test and pressing button, a connection test started..1 earch Test ples Automatic Test Database --------------------, |Alfbns New Test Sample | Customer |Hartmann _▼] ly Display All ID no....), depending the customer database! - Select the test sample the "ID no.... The values are highlighted grey colour and cannot modified this menu! After pressing the rt> button, first the "Visual Inspection" menu displayed. Confirm pressing button.... After the test has been successful and finished, the "Test sample OK" menu displayed. means of the "Search Field"... Untick the box "Display All" and enter the corresponding date the field "NextTest" means ofthe calendarfunction.. Now, the menu the selected test sample opens. 08/ 2012 58 .). pressing the button, possible interrupt measurement that e.. the no. The measuring data will stored the selected database (name) and can read out via PC... open switch), information message displayed.. After a positive connection test, the measurement started.. The sequence described here applies already existing database (name), customer (name) with registered test samples (ID no.." line and mark means the input stylus.. possible display the results pressing alu and save them pressing >)... ofTest Samples" and "ID no... In case faulty individual results that are dangerous, the measurement will interrupted immediate­ ly.. The result shown the fields "No..