ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 453 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Model 2234 Apparatus Scale L 2778 Doc.2.1 rd The PR122/P has been designed work accordance with the international standard: IEC 60947-2 voltage apparatus. SACE PR122/P Release Identification The PR122/P units available, accordance with the IEC standards, together with the various protections and the various standard and optional modules, are illustrated the following figure: m PR122/P For all versions o® Optional modules available PR120/V MEASURING 0 PR120/D-M COM PR120/K SIGNALLING PR120/D-BT WL-COM BT030 Rc(1) Note (1): See par. 16. The unit made using digital microprocessor technology and interfaces with the user means graphic display and keyboard. Circuit-breakers. 2 Page No. The unit's user interface also enables parameter setup and complete the prealarm and alarm management for the protection and watchdog functions.1 General The PR122/P high-performance self-supplied protection unit with Protection, easurem ent, Data storage, unication (optional), Self-test, Load control and Zone selectivity functions for the ABB SACE 'Emax' range and 4-pole low-voltage air circuit-breakers. 42/158 . It should noted that the reference current for the PR122/P the (the rated current defined the front Rating Plug) and not the (the uninterrupted rated current the itself). The unit opens the circuit-breaker which installed means the TC, which takes effect directly the device's mechanical leverism. Example: the E1B800 with 400 Rating Plug has 800 and 400 A. No. 1 3.2 cifica tio s 13.6 13.13. The protection unit self-supplied current sensors and primary voltages the PR120/V module installed. The protections available are: S bol Protection against L overload with inverse long time delay S short-circuit with adjustable delay I instantaneous short-circuit G earth fault with adjustable delay U phase unbalance OT temperature out range M closing short-circuit The PR122/P can installed 3-pole CBs with and without external neutral, 4-pole CBs