ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 450 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
2 tra ific tio s To adjust neutral (InN) comply with the following formula: I1x InN<Iu. Failure com ply ith the setting lim its for MI1" and "InN" can dam age the circuit-breaker,w ith consequentrisks the operator too. With the circuit-breaker open and possibly disconnected, install the protection unit the circuit-breaker.7. Circuit-breaker and release can now put into service.5. 5. * Note: * Offfor 3-pole versions * 50% for 4-pole versions * 100% for full-size versions 12 tin stru ctio tio service 12.6. 12. Actual maximum allowable adjustm ent must take into account any tem perature derating, term inals used and altitude, (rating plug)< 50% circuit breaker size. With 3-pole CB, with external neutral, the relay performs checks and setting done user. In the SACE PR121/P release, this protection can set for the following values: InN Off 50% 100% 200% In.6. 3.1), press and hold the Test" button for few seconds until all the red LEDs start flash confirm that installation complete. With 4-pole CB, this setting checked the relay which signals any failure means LED (see par. 39/158 . 2. 4. 6. E. 12. 7. A W ith circu it-b rs, ith external neutral the stm neutral ust set to O . 12. No. Model 2234 Apparatus Scale L 2778 Doc.1 s 3 - 4 Off 0.12.1 tra t The neutral protection normally set current value 50% the adjustment made the phases.6.4PR121/P default settings The PR121/P supplied ABB SACE with the following preset parameters: # Protection Tim e 1 144 s 2 Off 0. 12.1) andindependently adjusts this parameter, restoring within the accepted limits. Power the relay from any supply (Vaux, PR030/B, PR010/T). In some installations, where particularly high harmonics occur, the current circulating the neutral may higher than that the phases.: With E1B800 having 400A Rating Plug, 800A and 11n, InN adjustment may 50-100-200%.g.1 s 5 ains frequency Hz 6 Neutral sel.7. Power the unit with the PR030/B ONLY. 2 Page No. Note I1=1lnsetting intended the maximum adjustm ent the protection against overloads. there are errors other than the configuration error (see par.3 Replacing electronic release To complete the procedure for installing PR121/P take the following steps: 1. Remove the PR030/B. With E1B800 having 800A Rating Plug, 800A and 11n, InN adjustment may 50-100%. Make sure there are configuration errors ("Alive" LED on)