ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 430 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Make sure that the indicator (9) the DISCONNECTED position. Should necessary carry out offline circuit-breaker operations, the crank handle must removed. The SACE PR122 and SACE PR123 releases allow for the number operations performed the circuit-breaker service displayed at all times the special display. Furthermore, visibly earth the terminals both the power supply side and the load side. Proceed turn the crank handle clockwise until the TEST ISOLATED indication appears the indicator (9). Push the moving part right into the fixed part. For circuit-breakers with SACE PR122 and SACE PR123 releases, check the percentage wear the contacts. Insert the crank handle the corresponding coupling (10). Open the door the disconnected position. Fig. Make sure that the circuit-breaker open. 8. For the connection procedure, make sure that the key (12) the correct position and/or the padlock (14), any, has been removed. 19/158 . The table the maintenance program given the following paragraph, indicating the corresponding periodic intervals for action. Model 2234 Apparatus Scale L 2778 Doc-No' 1SDH000460R0002 Page No. Maintenance 8. It also advisable refer the following rules: - circuit-breakers which rarely operate, which remain closed for long periods, must operated from time time avoid any tendency to stick - during service, routinely inspect the circuit-breaker from the outside check for any dust, dirt damage any kind. Lower the releasing lever (11). ___________________________________________________________________________________________ c) Passing from the TEST ISOLATED position the CONNECTED position Make sure that the circuit-breaker open. Lower the releasing lever (11). b) Passing from the DISCONNECTED the TEST ISOLATED position Fig. Insert the crank handle the corresponding coupling (10). - For circuit-breakers fitted with SACE PR121 releases, installation the mechanical operation counter (supplied request) recommended. Proceed turn the crank handle clockwise until the CONNECTED indication appears the indicator (9). On the basis the results obtained during the routine checks, establish the best time intervals for the maintenance operations.1 g Before carrying out any maintenance work, necessary complete the following procedure: - open the circuit-breaker and check that the operating mechanism springs are unloaded - the case withdrawable circuit-breakers, work with the circuit-breaker racked-out the fixed part - for action fixed version circuit-breakers fixed parts withdrawable circuit-breakers, disconnect the supply the power circuit and to the auxiliary circuits. During the initial turns, the crank handle must oppose any particular resistance rotation. Remove the crank handle enable the circuit-breaker close. particular, with regard the time intervals, advisable follow the recommendations the table, least for the first year service. During normal service, the circuit-breakers require limited maintenance. ___________________________________________________________________________________________________________________________ d) Passing from the CONNECTED position, the TEST ISOLATED position, the DISCONNECTED position Repeat the connection procedures changing the direction for turning the crank handle anti-clockwise