The circuit-breaker closes correctly.
Carry out the operating tests.
The geared motor reloads the springs after
each closing operation.
The geared otor stops with the springs
loaded.
The circuit-breaker opens correctly.
P itiv ck
The spring loading lever moves correctly.
The circuit-breaker closes correctly.
Supply the shunt closing release its rated
voltage. Interlocking
devices between circuit-breakers side by
side and one top another (if any)
10 For withdrawable circuit-breakers: racking
-in/out device
P re
Carry out some opening and closing operations
(see the chapter 7.
Open the circuit-breaker.Putting into service
6.
Close the circuit-breaker. The signal changes
over. The first turns the crank handle
do not meet with particular resistance.
The springs are loaded correctly.
Note.
Insertthe auxiliary contacts suitable signalling
circuits.
The signals are correct.
Carry out some racking-in and out operations. The signals
are correct.1 eneral s
- Check tightness the power connections the circuit-breaker terminals
- Carry out all the preparatory operations the release
- Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications
- Make sure that there adequate air circulation the place installation avoid overheating
- Also carry out the checks specified the following table.
CAUTION
When there undervoltage release, the
circuit-breaker can only closed after the
release has been electrically energized.
The locks function correctly.
Disconnect voltage the release.
Open the circuit-breaker, turn the key and
remove from its seat.
Both anual and electrical closing are
prevented. The signals
are correct.
The circuit-breaker opens.
C arry som sin and ning
operations. Then put the circuit-breaker the
connected, test isolated and disconnected
position.2). Carry out some circuit-breaker closing
and opening operations. The
signals are correct.
The signals are given correctly. Attempt circuit-breaker
closing operation.
15/158
.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
Model 2234 Apparatus Scale
L 2778
Doc-Na 1SDH000460R0002
Page No.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
The signals due the relative operations are
given correctly.
Insertthe auxiliary contacts suitable signalling
circuits.
Racking-in operation: the circuit-breaker racks
in correctly.
ite d
1 Manual operating mechanism
2 Geared motor (if any)
3 Undervoltage release
(if any)
4 Shunt opening release (if any)
5 Shunt closing release (if any)
6 Circuit-breaker lock the open position
(with key padlocks)
7 Auxiliary contacts the circuit-breaker
8 Auxiliary contacts for signalling circuit-
breaker connected, test isolated and
disconnected
9 Lock vice circ it-b rs
connected and disconnected.
Supply the shunt opening release the
corresponding rated voltage. Supply the undervoltage release the
corresponding rated voltage (if any).
Supply the spring loading geared motor the
corresponding rated voltage