Open the circuit-breaker. The circuit-breaker closes correctly. Supply the shunt closing release its rated voltage. Supply the shunt opening release the corresponding rated voltage. Attempt circuit-breaker closing operation. The springs are loaded correctly. The signal changes over. 15/158 . Close the circuit-breaker. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Carry out some circuit-breaker closing and opening operations. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. Both anual and electrical closing are prevented. The signals are given correctly. The circuit-breaker closes correctly. Open the circuit-breaker, turn the key and remove from its seat. P itiv ck The spring loading lever moves correctly. The signals are correct. Supply the spring loading geared motor the corresponding rated voltage. The circuit-breaker opens correctly. The signals due the relative operations are given correctly. Carry out some racking-in and out operations. Supply the undervoltage release the corresponding rated voltage (if any). The signals are correct. Insertthe auxiliary contacts suitable signalling circuits.1 eneral s - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. Model 2234 Apparatus Scale L 2778 Doc-Na 1SDH000460R0002 Page No. The locks function correctly. The geared otor stops with the springs loaded. Carry out the operating tests. The circuit-breaker opens. The signals are correct. The signals are correct. C arry som sin and ning operations.2). Disconnect voltage the release. Racking-in operation: the circuit-breaker racks in correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation.Putting into service 6. ite d 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 Lock vice circ it-b rs connected and disconnected. Insertthe auxiliary contacts suitable signalling circuits. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device P re Carry out some opening and closing operations (see the chapter 7. Then put the circuit-breaker the connected, test isolated and disconnected position. Note. The first turns the crank handle do not meet with particular resistance. The geared motor reloads the springs after each closing operation