Putting into service
6.1 eneral s
- Check tightness the power connections the circuit-breaker terminals
- Carry out all the preparatory operations the release
- Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications
- Make sure that there adequate air circulation the place installation avoid overheating
- Also carry out the checks specified the following table.
Carry out the operating tests.
The circuit-breaker closes correctly.
The springs are loaded correctly.
Close the circuit-breaker.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
Disconnect voltage the release.
The geared otor stops with the springs
loaded.
The signals are correct. Carry out some circuit-breaker closing
and opening operations. Interlocking
devices between circuit-breakers side by
side and one top another (if any)
10 For withdrawable circuit-breakers: racking
-in/out device
P re
Carry out some opening and closing operations
(see the chapter 7.
CAUTION
When there undervoltage release, the
circuit-breaker can only closed after the
release has been electrically energized. Supply the undervoltage release the
corresponding rated voltage (if any).
The locks function correctly.
The circuit-breaker opens.2).
Racking-in operation: the circuit-breaker racks
in correctly. Attempt circuit-breaker
closing operation.
Carry out some racking-in and out operations.
Insertthe auxiliary contacts suitable signalling
circuits. The first turns the crank handle
do not meet with particular resistance.
The circuit-breaker closes correctly.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
15/158
. The
signals are correct.
ite d
1 Manual operating mechanism
2 Geared motor (if any)
3 Undervoltage release
(if any)
4 Shunt opening release (if any)
5 Shunt closing release (if any)
6 Circuit-breaker lock the open position
(with key padlocks)
7 Auxiliary contacts the circuit-breaker
8 Auxiliary contacts for signalling circuit-
breaker connected, test isolated and
disconnected
9 Lock vice circ it-b rs
connected and disconnected.
The geared motor reloads the springs after
each closing operation. The signal changes
over.
Note. The signals
are correct.
Open the circuit-breaker, turn the key and
remove from its seat.
Supply the spring loading geared motor the
corresponding rated voltage.
C arry som sin and ning
operations.
The signals are given correctly.
P itiv ck
The spring loading lever moves correctly.
The circuit-breaker opens correctly.
Supply the shunt closing release its rated
voltage.
Open the circuit-breaker. The signals
are correct. Then put the circuit-breaker the
connected, test isolated and disconnected
position.
Insertthe auxiliary contacts suitable signalling
circuits.
The signals due the relative operations are
given correctly.
Both anual and electrical closing are
prevented.
Supply the shunt opening release the
corresponding rated voltage.