ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 426 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Attempt circuit-breaker closing operation. The circuit-breaker opens correctly. ite d 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 Lock vice circ it-b rs connected and disconnected. The geared otor stops with the springs loaded. C arry som sin and ning operations. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. P itiv ck The spring loading lever moves correctly. Close the circuit-breaker. The geared motor reloads the springs after each closing operation. The locks function correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Disconnect voltage the release.2). The signals are correct. Then put the circuit-breaker the connected, test isolated and disconnected position. The signal changes over. The circuit-breaker closes correctly. Both anual and electrical closing are prevented. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. The circuit-breaker opens. Model 2234 Apparatus Scale L 2778 Doc-Na 1SDH000460R0002 Page No. Insertthe auxiliary contacts suitable signalling circuits. Supply the shunt closing release its rated voltage.Putting into service 6. Open the circuit-breaker. Open the circuit-breaker, turn the key and remove from its seat. Carry out some circuit-breaker closing and opening operations. 15/158 . Carry out some racking-in and out operations.1 eneral s - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. The signals are correct. The first turns the crank handle do not meet with particular resistance. Note. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device P re Carry out some opening and closing operations (see the chapter 7. Carry out the operating tests. Supply the shunt opening release the corresponding rated voltage. Racking-in operation: the circuit-breaker racks in correctly. Supply the undervoltage release the corresponding rated voltage (if any). The circuit-breaker closes correctly. The springs are loaded correctly. Insertthe auxiliary contacts suitable signalling circuits. The signals due the relative operations are given correctly. The signals are correct. The signals are given correctly. Supply the spring loading geared motor the corresponding rated voltage. The signals are correct