ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 426 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The circuit-breaker opens correctly. Open the circuit-breaker, turn the key and remove from its seat. Then put the circuit-breaker the connected, test isolated and disconnected position. The geared motor reloads the springs after each closing operation. The circuit-breaker opens. Carry out some racking-in and out operations. Supply the spring loading geared motor the corresponding rated voltage. The locks function correctly. Supply the shunt opening release the corresponding rated voltage. The geared otor stops with the springs loaded. Both anual and electrical closing are prevented. Close the circuit-breaker. The signals are correct. Supply the shunt closing release its rated voltage.Putting into service 6. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Supply the undervoltage release the corresponding rated voltage (if any). Insertthe auxiliary contacts suitable signalling circuits. The signals are correct. Disconnect voltage the release. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device P re Carry out some opening and closing operations (see the chapter 7. The circuit-breaker closes correctly. P itiv ck The spring loading lever moves correctly. Model 2234 Apparatus Scale L 2778 Doc-Na 1SDH000460R0002 Page No. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Carry out the operating tests. The signals are given correctly. The signals due the relative operations are given correctly. The springs are loaded correctly. Open the circuit-breaker. Carry out some circuit-breaker closing and opening operations. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. C arry som sin and ning operations. Note. 15/158 .1 eneral s - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. The signals are correct. The circuit-breaker closes correctly. ite d 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 Lock vice circ it-b rs connected and disconnected.2). Insertthe auxiliary contacts suitable signalling circuits. The signals are correct. The signal changes over. The first turns the crank handle do not meet with particular resistance. Attempt circuit-breaker closing operation. Racking-in operation: the circuit-breaker racks in correctly