ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 426 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Open the circuit-breaker, turn the key and remove from its seat. Close the circuit-breaker. The locks function correctly. The circuit-breaker opens. Racking-in operation: the circuit-breaker racks in correctly. The signals due the relative operations are given correctly. Supply the spring loading geared motor the corresponding rated voltage. Carry out the operating tests. Supply the undervoltage release the corresponding rated voltage (if any). Note. Supply the shunt opening release the corresponding rated voltage. The signals are correct. Insertthe auxiliary contacts suitable signalling circuits. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device P re Carry out some opening and closing operations (see the chapter 7. ite d 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 Lock vice circ it-b rs connected and disconnected. 15/158 . The signals are given correctly. C arry som sin and ning operations. The circuit-breaker opens correctly. The signals are correct.2). Supply the shunt closing release its rated voltage. Both anual and electrical closing are prevented. P itiv ck The spring loading lever moves correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. The geared motor reloads the springs after each closing operation.1 eneral s - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. Attempt circuit-breaker closing operation. Insertthe auxiliary contacts suitable signalling circuits. Disconnect voltage the release. The signals are correct. Carry out some circuit-breaker closing and opening operations. The signal changes over. Open the circuit-breaker. The first turns the crank handle do not meet with particular resistance. The circuit-breaker closes correctly. Carry out some racking-in and out operations. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. The springs are loaded correctly. The geared otor stops with the springs loaded.Putting into service 6. The circuit-breaker closes correctly. The signals are correct. Model 2234 Apparatus Scale L 2778 Doc-Na 1SDH000460R0002 Page No. Then put the circuit-breaker the connected, test isolated and disconnected position