ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 426 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The signal changes over. The locks function correctly. The signals are correct. 15/158 . Model 2234 Apparatus Scale L 2778 Doc-Na 1SDH000460R0002 Page No. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. The geared otor stops with the springs loaded. Carry out some circuit-breaker closing and opening operations. The signals are correct. Both anual and electrical closing are prevented. Racking-in operation: the circuit-breaker racks in correctly. The signals are correct. Carry out some racking-in and out operations. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Insertthe auxiliary contacts suitable signalling circuits. The signals are correct. The springs are loaded correctly.Putting into service 6. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device P re Carry out some opening and closing operations (see the chapter 7. Supply the undervoltage release the corresponding rated voltage (if any). The first turns the crank handle do not meet with particular resistance.1 eneral s - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Carry out the operating tests. The circuit-breaker opens. Note. Supply the shunt closing release its rated voltage. The circuit-breaker closes correctly. Insertthe auxiliary contacts suitable signalling circuits. The signals are given correctly. The geared motor reloads the springs after each closing operation. C arry som sin and ning operations. P itiv ck The spring loading lever moves correctly. Attempt circuit-breaker closing operation. Supply the shunt opening release the corresponding rated voltage. Open the circuit-breaker, turn the key and remove from its seat. Close the circuit-breaker. Supply the spring loading geared motor the corresponding rated voltage.2). ite d 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 Lock vice circ it-b rs connected and disconnected. Open the circuit-breaker. The signals due the relative operations are given correctly. The circuit-breaker opens correctly. Then put the circuit-breaker the connected, test isolated and disconnected position. The circuit-breaker closes correctly. Disconnect voltage the release