The signals are given correctly.
The signals due the relative operations are
given correctly. Supply the undervoltage release the
corresponding rated voltage (if any).1 eneral s
- Check tightness the power connections the circuit-breaker terminals
- Carry out all the preparatory operations the release
- Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications
- Make sure that there adequate air circulation the place installation avoid overheating
- Also carry out the checks specified the following table.
Supply the shunt closing release its rated
voltage.
The circuit-breaker opens.
Supply the shunt opening release the
corresponding rated voltage.
The signals are correct.
Supply the spring loading geared motor the
corresponding rated voltage.
The geared otor stops with the springs
loaded.
The circuit-breaker closes correctly.
Insertthe auxiliary contacts suitable signalling
circuits.
Open the circuit-breaker.2).
Carry out the operating tests.
Close the circuit-breaker.
The locks function correctly.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
Both anual and electrical closing are
prevented.
The geared motor reloads the springs after
each closing operation. The signals
are correct.Putting into service
6.
15/158
.
Model 2234 Apparatus Scale
L 2778
Doc-Na 1SDH000460R0002
Page No. The first turns the crank handle
do not meet with particular resistance.
Disconnect voltage the release.
CAUTION
When there undervoltage release, the
circuit-breaker can only closed after the
release has been electrically energized. Attempt circuit-breaker
closing operation. Then put the circuit-breaker the
connected, test isolated and disconnected
position.
Insertthe auxiliary contacts suitable signalling
circuits. Interlocking
devices between circuit-breakers side by
side and one top another (if any)
10 For withdrawable circuit-breakers: racking
-in/out device
P re
Carry out some opening and closing operations
(see the chapter 7.
Note.
The circuit-breaker closes correctly. Carry out some circuit-breaker closing
and opening operations.
P itiv ck
The spring loading lever moves correctly.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
Carry out some racking-in and out operations.
Open the circuit-breaker, turn the key and
remove from its seat.
ite d
1 Manual operating mechanism
2 Geared motor (if any)
3 Undervoltage release
(if any)
4 Shunt opening release (if any)
5 Shunt closing release (if any)
6 Circuit-breaker lock the open position
(with key padlocks)
7 Auxiliary contacts the circuit-breaker
8 Auxiliary contacts for signalling circuit-
breaker connected, test isolated and
disconnected
9 Lock vice circ it-b rs
connected and disconnected.
Racking-in operation: the circuit-breaker racks
in correctly. The
signals are correct.
C arry som sin and ning
operations. The signals
are correct.
The circuit-breaker opens correctly. The signal changes
over.
The springs are loaded correctly