ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 194 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The password valid for maximum two minutes from the last time key was pressed. Check the open closed state the circuit-breaker the same "PR122/DC Test" screen, checking that closed and de-energized. With the circuit-breaker open and preferably isolated, install the protection unit the circuit-breaker 2.12.4. Input the password 8 Select "Install" and press "ENTER" 9.5. Input the password 6 Select "Uninstall" and press "ENTER" 7. If the password wrong, the message Wrong password appears and remains until the ESC key pressed (or until interval seconds has elapsed).3.). 12. To enter new password, select the "New Password" item the "Settings/System" menu. No. Select "Unit installation" 5.1 Installation To complete the procedure for installing PR122/DC unit, follow the steps below: 1.3. Disabling the Password. Apart from this, absolutely indispensable for the user modify the password and carefully define each modifiable parameter, before putting the PR122/DC into service. 12. Power the unit ONLY from the PR030/B 3. It also possible interrupt the password entry procedure pressing the ESC key. 12. The values attributable the password from 0000 9999. When the red led flashes and off and the message Installation (installation error) displayed, remove the PR030/B 10. Power the relay from any other source 11. It not strictly necessary complete the uninstalling procedure, but this enables the parameters relating the circuit-breaker, such contact wear and others, otherwise these data would lost. For the PR120/V-PR120/LV module, set the Rated Voltage suitably. type circuit-breaker, Rating Plug size . Select the value the first figure between '0' and '9' means the and keys and press confirm the figure and then move enter the next one. 12.4 Password management Specify password? [0***] To enter "EDIT" mode necessary enter four-figure numerical password. With the circuit-breaker open and/or isolated power the unit from the PR030/B 2. positive result shown the display. therefore always possible to switch from "READ" "EDIT". 1SDH000635R0002 Page No. Remove the PR030/B module 8 Remove the PR122/DC unit from the circuit-breaker 9. 12. 36/1 08 T 1/6 C s A t T rip ) C open .. the password correct, you from the "READ" state the "EDIT" state.4. Enter the unit's "Settings" menu 3. The remove the connector, proceed indicated the figure alongside. Select "Circuit-breaker" 4. For the default password see par.g. Model L3447 pparatus Emax cale Doc. Note that ABB SACE defines each possible setting according the content the paragraph the default parameters (see par. After entering the fourth figure, check the password you have entered. Then test can conducted the whole chain, again using the specific function (Trip test). The data question are then transmitted the new PR122/DC unit installed the same circuit-breaker. By setting the value the password [0000] (on the "Unit configuration" menu) the password prom disabled.To run Trip Test, press the Test” button and the Enter” button simultaneously.3.5 Replacing electronic release 12.3..2 Test Before putting into service, test can conducted means the specific "Auto test" function which can activated the PR122/DC.1 connection test A If the PR122/DC was installed the user, important, before closing the CB, check the last line the display when the relay turned for the first time via PR030/B battery unit. positive result shown the circuit-breaker opening.3 Putting into service 12. there are other errors, the display will show the message Configuration (configuration error) accompanied the yellow LED coming permanently (warning) 4. disconnected messages must appear; they do, do not close the circuit-breaker and make the correct connections. Check for the absence configuration errors. Enter the unit's "Settings" menu 5.5.4. Select "Circuit-breaker" 6 Select "Unit installation" 7.2 Uninstalling To complete the procedure for uninstalling PR122/DC unit, follow the steps below: 1.3.4).12.3. 12.3.3 Initial settings If the PR122/DC supplied ready installed the circuit-breaker, ABB SACE set all the variables referring the circuit-breaker or the specific application correctly (e