ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 174 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The geared motor automatically reloads the springs after each closing operation until the yellow indicator appears Fig. 16/1 08 . Even with the closing springs unloaded, the operating mechanism retains enough energy for the opening operation. When there shunt opening release, the operation can also carried out remotely means the special control circuit. The special indicator (3) changes indicate "I" signal that the circuit-breaker has closed. For manual closing, press the pushbutton (5) marked with the letter “I” When there shunt closing release, the operation can carried out remotely means the special control circuit.7. is, any case, always possible complete the reloading operation manually. Fig.2 ircu it-b clo sin and res The operation the circuit-breaker can either manual electrical. Fig. Furthermore, the indicator the state the springs (6) goes the WHITE position. a) Manual loading the closing springs - Make sure that the indicator (3) shows "O" (circuit-breaker open) - Make sure that the indicator (6) WHITE (springs unloaded) - Repeatedly activate the lever (2) until the indicator (6) changes its color YELLOW b) Electrical loading the closing springs The electrical loading the circuit-breaker possible when the following accessories (supplied request) are present: - geared motor for automatic loading the closing springs - shunt closing release - shunt opening release. Fig. 26 d) Opening the circuit-breaker For manual opening the circuit-breaker, press pushbutton (1). The geared motor, if any, immediately starts the automatic spring reloading operation. 27 Model L3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. Opening having taken place signaled the letter “O” appearing the indicator (3). 25). _______________________________________________________ c) Closing the circuit-breaker The operation can only carried out with the closing springs fully loaded. When the power is cut off during loading, the geared motor stops and automatically starts reloading the springs again when the power returns