Positive check
The spring loading lever moves correctly.
CAUTION
When there undervoltage release, the
circuit-breaker can only closed after the
release has been electrically energized. Then put the circuit-breaker the
connected, test isolated and disconnected
position.
Supply the shunt opening release the
corresponding rated voltage.
The signals due the relative operations are
given correctly.
The circuit-breaker opens. The
signals are correct.
Open the circuit-breaker, turn the key and
remove from its seat. Carry out some circuit-breaker closing
and opening operations.
Carry out the operating tests.
The circuit-breaker closes correctly.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.
Supply the spring loading geared motor the
corresponding rated voltage.
The locks function correctly.
The springs are loaded correctly. The signals
are correct.
Close the circuit-breaker.1 eneral res
- Check tightness the power connections the circuit-breaker terminals
- Carry out all the preparatory operations the release
- Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications
- Make sure that there adequate air circulation the place installation avoid overheating
- Also carry out the checks specified the following table. The first turns the crank handle
do not meet with particular resistance.
Open the circuit-breaker.
The signals are given correctly. Attempt circuit-breaker
closing operation.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation.2).
The geared motor stops with the springs
loaded. The signals
are correct. Supply the undervoltage release the
corresponding rated voltage (if any). The signal changes
over.
Racking-in operation: the circuit-breaker racks
in correctly.
Model L3447
A pparatus Emax DC
S cale
D oc-N 1SDH000635R0002
Page No.
Carry out some racking-in and out operations.
Both anual and electrical closing are
prevented.
The circuit-breaker closes correctly.
Item inspected
1 Manual operating mechanism
2 Geared motor (if any)
3 Undervoltage release
(if any)
4 Shunt opening release (if any)
5 Shunt closing release (if any)
6 Circuit-breaker lock the open position
(with key padlocks)
7 Auxiliary contacts the circuit-breaker
8 Auxiliary contacts for signalling circuit-
breaker connected, test isolated and
disconnected
9 vice irc it-b rs
connected and disconnected. Interlocking
devices between circuit-breakers side by
side and one top another (if any)
10 For withdrawable circuit-breakers: racking
-in/out device
Procedure
Carry out some opening and closing operations
(see the chapter 7.
The signals are correct.
Disconnect voltage the release.
Insert the auxiliary contacts suitable signalling
circuits.Putting into service
6.
14/1 08
.
The circuit-breaker opens correctly.
Note.
The geared motor reloads the springs after
each closing operation.
C arry som sin and g
operations.
Supply the shunt closing release its rated
voltage.
Insert the auxiliary contacts suitable signalling
circuits