ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 172 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Insert the auxiliary contacts suitable signalling circuits. Supply the shunt closing release its rated voltage. The circuit-breaker closes correctly. Supply the spring loading geared motor the corresponding rated voltage. The circuit-breaker opens correctly. Supply the undervoltage release the corresponding rated voltage (if any). The signal changes over. The locks function correctly. 14/1 08 . Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device Procedure Carry out some opening and closing operations (see the chapter 7. The first turns the crank handle do not meet with particular resistance. Open the circuit-breaker, turn the key and remove from its seat. Then put the circuit-breaker the connected, test isolated and disconnected position. The signals are given correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Racking-in operation: the circuit-breaker racks in correctly. Item inspected 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 vice irc it-b rs connected and disconnected. The geared motor reloads the springs after each closing operation. Positive check The spring loading lever moves correctly.2). Note. The circuit-breaker opens. The geared motor stops with the springs loaded. Carry out some racking-in and out operations. Carry out some circuit-breaker closing and opening operations. The signals are correct. Close the circuit-breaker. Disconnect voltage the release. Insert the auxiliary contacts suitable signalling circuits. Model L3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. Open the circuit-breaker. Both anual and electrical closing are prevented. Supply the shunt opening release the corresponding rated voltage. The signals are correct. The signals are correct. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. The springs are loaded correctly.1 eneral res - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table.Putting into service 6. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. Carry out the operating tests. Attempt circuit-breaker closing operation. The signals are correct. The circuit-breaker closes correctly. C arry som sin and g operations. The signals due the relative operations are given correctly