ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 172 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Disconnect voltage the release. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device Procedure Carry out some opening and closing operations (see the chapter 7. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Supply the shunt closing release its rated voltage. 14/1 08 . Carry out the operating tests. The signals are given correctly. Insert the auxiliary contacts suitable signalling circuits. The circuit-breaker closes correctly. Open the circuit-breaker, turn the key and remove from its seat. Insert the auxiliary contacts suitable signalling circuits. Supply the spring loading geared motor the corresponding rated voltage. The signal changes over. Supply the undervoltage release the corresponding rated voltage (if any). Then put the circuit-breaker the connected, test isolated and disconnected position.Putting into service 6. Supply the shunt opening release the corresponding rated voltage. Open the circuit-breaker. The circuit-breaker opens.2). The locks function correctly. Carry out some racking-in and out operations. The springs are loaded correctly. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. Racking-in operation: the circuit-breaker racks in correctly. Attempt circuit-breaker closing operation. Positive check The spring loading lever moves correctly. The signals are correct. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Carry out some circuit-breaker closing and opening operations. The signals are correct. Both anual and electrical closing are prevented. Close the circuit-breaker. The signals are correct. The geared motor reloads the springs after each closing operation. The first turns the crank handle do not meet with particular resistance.1 eneral res - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. Model L3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. The signals are correct. The circuit-breaker opens correctly. C arry som sin and g operations. The signals due the relative operations are given correctly. The geared motor stops with the springs loaded. Note. The circuit-breaker closes correctly. Item inspected 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 vice irc it-b rs connected and disconnected