ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 172 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The signals are correct. The circuit-breaker opens. Carry out some circuit-breaker closing and opening operations. The signals are correct. Both anual and electrical closing are prevented. Insert the auxiliary contacts suitable signalling circuits. Open the circuit-breaker.2). Supply the spring loading geared motor the corresponding rated voltage. Racking-in operation: the circuit-breaker racks in correctly. The signals are correct. Positive check The spring loading lever moves correctly. The first turns the crank handle do not meet with particular resistance. C arry som sin and g operations. Insert the auxiliary contacts suitable signalling circuits. Carry out the operating tests. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. 14/1 08 . CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. Item inspected 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 vice irc it-b rs connected and disconnected. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. The circuit-breaker closes correctly. Model L3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. The springs are loaded correctly. The geared motor stops with the springs loaded. Supply the shunt opening release the corresponding rated voltage.Putting into service 6. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device Procedure Carry out some opening and closing operations (see the chapter 7. The signals due the relative operations are given correctly. The locks function correctly. The geared motor reloads the springs after each closing operation. Then put the circuit-breaker the connected, test isolated and disconnected position. Disconnect voltage the release. The circuit-breaker opens correctly. Supply the undervoltage release the corresponding rated voltage (if any). Attempt circuit-breaker closing operation. Close the circuit-breaker. The circuit-breaker closes correctly. The signal changes over. Open the circuit-breaker, turn the key and remove from its seat. Note. The signals are correct. Supply the shunt closing release its rated voltage.1 eneral res - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. The signals are given correctly. Carry out some racking-in and out operations