The first turns the crank handle
do not meet with particular resistance.
The signals due the relative operations are
given correctly.
Carry out some racking-in and out operations.
Supply the spring loading geared motor the
corresponding rated voltage.
The circuit-breaker opens.
14/1 08
. The signal changes
over.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation. Interlocking
devices between circuit-breakers side by
side and one top another (if any)
10 For withdrawable circuit-breakers: racking
-in/out device
Procedure
Carry out some opening and closing operations
(see the chapter 7.1 eneral res
- Check tightness the power connections the circuit-breaker terminals
- Carry out all the preparatory operations the release
- Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications
- Make sure that there adequate air circulation the place installation avoid overheating
- Also carry out the checks specified the following table.
The circuit-breaker opens correctly.
The circuit-breaker closes correctly. The signals
are correct.
The signals are given correctly.
Both anual and electrical closing are
prevented.
Note. Supply the undervoltage release the
corresponding rated voltage (if any).
Item inspected
1 Manual operating mechanism
2 Geared motor (if any)
3 Undervoltage release
(if any)
4 Shunt opening release (if any)
5 Shunt closing release (if any)
6 Circuit-breaker lock the open position
(with key padlocks)
7 Auxiliary contacts the circuit-breaker
8 Auxiliary contacts for signalling circuit-
breaker connected, test isolated and
disconnected
9 vice irc it-b rs
connected and disconnected.
S upply the undervoltage release the
corresponding rated voltage and carry out the
circuit-breaker closing operation. Carry out some circuit-breaker closing
and opening operations.
Positive check
The spring loading lever moves correctly.
CAUTION
When there undervoltage release, the
circuit-breaker can only closed after the
release has been electrically energized.
The geared motor stops with the springs
loaded.
Open the circuit-breaker.
Supply the shunt closing release its rated
voltage.
Carry out the operating tests. The signals
are correct.
The signals are correct.
Model L3447
A pparatus Emax DC
S cale
D oc-N 1SDH000635R0002
Page No.
Disconnect voltage the release.2).
Close the circuit-breaker.
Open the circuit-breaker, turn the key and
remove from its seat.
Supply the shunt opening release the
corresponding rated voltage.
The locks function correctly.
Insert the auxiliary contacts suitable signalling
circuits.
The circuit-breaker closes correctly.
Racking-in operation: the circuit-breaker racks
in correctly. Attempt circuit-breaker
closing operation. Then put the circuit-breaker the
connected, test isolated and disconnected
position.
Insert the auxiliary contacts suitable signalling
circuits. The
signals are correct.
The geared motor reloads the springs after
each closing operation.Putting into service
6.
C arry som sin and g
operations.
The springs are loaded correctly