ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 172 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Insert the auxiliary contacts suitable signalling circuits. Interlocking devices between circuit-breakers side by side and one top another (if any) 10 For withdrawable circuit-breakers: racking -in/out device Procedure Carry out some opening and closing operations (see the chapter 7. Supply the spring loading geared motor the corresponding rated voltage. Note. Carry out the operating tests. Close the circuit-breaker. Both anual and electrical closing are prevented. The geared motor reloads the springs after each closing operation. The circuit-breaker closes correctly. Carry out some racking-in and out operations. Open the circuit-breaker. Then put the circuit-breaker the connected, test isolated and disconnected position. The circuit-breaker opens correctly. Supply the shunt closing release its rated voltage. The geared motor stops with the springs loaded. 14/1 08 . Racking-in operation: the circuit-breaker racks in correctly. Item inspected 1 Manual operating mechanism 2 Geared motor (if any) 3 Undervoltage release (if any) 4 Shunt opening release (if any) 5 Shunt closing release (if any) 6 Circuit-breaker lock the open position (with key padlocks) 7 Auxiliary contacts the circuit-breaker 8 Auxiliary contacts for signalling circuit- breaker connected, test isolated and disconnected 9 vice irc it-b rs connected and disconnected.Putting into service 6. Positive check The spring loading lever moves correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. The signal changes over. Supply the shunt opening release the corresponding rated voltage. C arry som sin and g operations.1 eneral res - Check tightness the power connections the circuit-breaker terminals - Carry out all the preparatory operations the release - Make sure that the value the auxiliary circuit power supply voltage between and 110% the rated voltage the electrical applications - Make sure that there adequate air circulation the place installation avoid overheating - Also carry out the checks specified the following table. Open the circuit-breaker, turn the key and remove from its seat. The signals are correct. The circuit-breaker opens. The signals are correct. Disconnect voltage the release. Supply the undervoltage release the corresponding rated voltage (if any). Carry out some circuit-breaker closing and opening operations. Attempt circuit-breaker closing operation. The signals are correct. CAUTION When there undervoltage release, the circuit-breaker can only closed after the release has been electrically energized. The locks function correctly. Model L3447 A pparatus Emax DC S cale D oc-N 1SDH000635R0002 Page No. The circuit-breaker closes correctly.2). The first turns the crank handle do not meet with particular resistance. The signals due the relative operations are given correctly. The springs are loaded correctly. S upply the undervoltage release the corresponding rated voltage and carry out the circuit-breaker closing operation. Insert the auxiliary contacts suitable signalling circuits. The signals are correct. The signals are given correctly