ABB Polohové spínače

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Základní přehled polohových spínačů ...

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 37 z 238

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
125 0..... M IEC 20/22 PVC cable code.5 13-141 1 3..9 4.............0 mm LS2 12D11-□ 01 0 3.9 3...01...............1 m/s 0.................2 5...............0 mm BK 22 B 91-291 - 13-141 1^ 9 _13-141 ^ 91-291 _ 13-141 1^ Non-overlapping Slow action contacts 13 BK Zb Type Operation diagram LS2 11D11-□ 01 0 1.5 m/s 0....2 Weight (1) (packing per unit) 0..4 5.7 01.01..0 01..M......01........4 5......... 6 Plastic casing.. Limit Switches Plastic Casing [□] and Metal Casing IP67 Width Prewired Movement detected: For lastic Casing: Cable: 0........ and LS2............P.....9 8.......130 0.0 5...3 5.......2 3.....................................0 mm 14 3..................75 mm2/ AWG 18 Length: m (Other lengths seeordering details) Actuator Metal plunger Metal Roller plunger Metal plunger (with dust protection cup) Metal plunger with fixing nuts @ (N....7 mm LS2 16D11-□ 01 0 1.0 01..3 6....0 5.........................................125 0. 1 d I ■ Additional Technical Data Cable output left right code.... force torque: actuation N - positive opening operation N O d 1 30° s............ iClosedcontact/ iOpencontact Dimensions (mm) 28 1SBC141157C0202 ...... P UL PVC cable code.5 m/s 0................................9 3....4 5.......73....050 with metal casing..9 4...............9 8.........75 mm2/ AWG 18 Length: m (Other lengths seeordering details) For etal Casing: Cable: 0.. P Metal casing.........C.......LS2.140 (1)add 0.0 mm 21-221 1 LS2 21D11-□ 01 0 1................................9 3........ contact with positive opening operation) © Maximum actuation speed 0...0 5..5 m/s Min.. 5 Cable output bottom code..... U Type completed with the above codes □ Snap action contacts Type LS2 11B11- LS2 12B11-□ LS2 16B11-□ LS2 21B11-□ 01 13 BK Zb Operation diagram 01.............9 4........................