1 Before set up
C EAKERS
Ensure that the plant question com patible ith the ATS:
□ the gen set ust operate isolation”
□ net rated voltage and frequency ust ith the accepted range
□ ATS010 pow supply ust guaranteed even oth net and gen set pow er
are out.Installation and set-up
This chapter contains practical guide ATS010 sta lla tion and set-up.
❖ independent pow supply available otor operators (or control
coils), llo the diagram indicated ith safe xiliary pow supply”
❖ instead the otor operators con trol coils) are pow ered the net gen
set, llo the diagram indicated itho safe xilia pow supply” .4)
W CHECK
W irin diagrams needed use the ATS010 ith Isom ax, and circu it
breakers are included ith this manual.
M ake certain that oth irc breakers controlled the ATS have the correct
characteristics.
5. The circu breakers ust be:
□ echanically interlocked
□ acceptable terms type and rating
□ fitte ith the required accessories (see 5.
Use the llo pages checklist, tic each operation and test go
along.
ABB SACE SACE ATS010 RH0202002 L2467.
The guide includes:
- note checking the correct sta lla tion the ATS010
- guide the set-up procedure check irin errors
- troubleshooting guide dica ting the problem ost frequently encountered
during installation