OMNIMATE – Device connectivity and electronics housings

| Kategorie: Katalog  | Tento dokument chci!

Weidmüller is a leading international provider of solutions for electrical connectivity,transmission and conditioning of power, signal and data in industrial environments.The company with headquarters in Detmold/Germany develops, produces and sellsproducts in the field of electrical connectivity and electronics all over the world.

Vydal: Weidmüller, s.r.o. Autor: Weidmueller

Strana 415 z 707

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
The OMNIMATE Power product line already complies with the stricter IEC requirements for additional touch protection. An additional cover required the connection system, a device section, does not fulfil these requirements.5 . OMNIMATEPower PCBConnectors F F. This allows you to avoid making approval compromises such 508C or incorporating complex additions such coatings or protective hoods.Connectors for systems Explanation No limitation for approval with 600-V applications: with optimised creepage and clearance distance even under difficult installation situations.5 for 400-V systems (wire-to-earth voltage 400 event error). Uncompromised safety 600 V { IEC 61800-5-1:2007 A L1 Z T Finger safety according DIN 61800-5-1 Since the end 2007, device approval according IEC Directive “Adjustable speed electrical power drive systems – Part 5-1: Safety requirements” requires that regardless of the line-to-earth voltage additional finger safety interval exists (for example, for 400 V-TN systems (wire-to- earth voltage 230 V), 5. UL approval without compromise Details such insulated contact tips that ensure the pin header touch-safe and automatic snap-in for secure interlocking connection. Clearance and creepage distances, acc. The OMNIMATE Power product line already complies with the requirements for 600-V creepage and clearance distances. UL A 600-V connector must have the approval the 1059 component directive but the potential installation situations must first taken into consideration