ter than the question ark can used.o. his used express decim al
num ber
w ith ith the exponent. his code exe the rogram line.
<C >
C cte rogram Data.
<lf> Line feed.
A lis s:
C and escription.
<cr> rria return.g. his
com and perm its ell used request.
S ritte lin .
T tio rip tio n
SCPI OUTPut and Sum ary
Command Description
O t[:S eturns the state the tpu term inals.
?
A flag indicating req for the the ter specified the
com and. code 10. his code exe the rogram line.
T s
User Manual v16 41
.9. code 13.
(?)
A flag indicating req for the ter cifie the com and. 1}.
C and a
k e
c tib ility ith sta I.
O t[:S ]{O ctiva dea ctivate tpu .
E N
N :
E lf> rlf> tim lib r
p rfo all ritte lin fte lf> rlf> ith t
th lin . sually rep group lte tive cte r
param eters.3 Command syntax
T rib iss (IE ). E.
MEATEST, s.
C (
[ lte tiv rs.r.
C ita ritte .________________________________________ M191 Insulation Tester Calibrator
D escription Abbreviations
Abbreviation Description
<D >
D ecim eric rogram Data