Connection
lugs must routed into the building such way
that they are resistant pressurised water above
the maximum groundwater level.
If the exterior walls and the foundation plate are sur-
rounded with perimeter insulation, the earther the
floor plate still has some earthing effect the strip
foundation open the bottom.4.e. functional equipotential bonding
cable must created the foundation.
If the perimeter insulation only the surrounding
walls, earther contact often still intact. often consists polyurethane
foam sheets crushed glass. The founda-
tion earther can implemented the concrete.4.Insulated floor plate (perimeter insulation, shown here blue)
2.
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
162
Chapter The external lightning protection system
.
Because the foundation earther longer has contact
with the earth here, additional grid ring earther
must created.
To ensure contact with the earth, water-impermeable
concrete must not used. all surrounding walls, strip
foundations and the bottom the foundation, the
function the foundation earther longer fulfilled.
If the building structure surrounded all sides by
perimeter insulation, i.4 Perimeter insulation
Perimeter insulation heat insulation, which sur-
rounds the area the structure contact with the
earth from outside