A HISTORY OF EDISON'S WEST ORANGE LABORATORY 1887-1931

| Kategorie: Kniha  | Tento dokument chci!

Vydal: Neurčeno

Strana 489 z 567

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.

Jak získat tento dokument?






Poznámky redaktora
had divided the functions of engineering and administration. The major customer the lab was the Phonograph Works. Edison's comment that "if good engineer, will poor biz man rule" reveals something his attitude the engineers his laboratory After Edison relinquished his control over the R&D effort there would never engineer experimenter who had the power make business decisions the laboratory; the new divisional structure TAE Inc. The work the Engineering Department was totally devoted the phonograph product and it was distinguished from R&D the accounting system.XII-21 run the engineering effort and not the business the lab. The Engineering Notice had become the main product of the West Orange laboratory. The first duty of this department was "record, systematize and issue information the manufacturing organization. was the formal instrument to . The bulk the work the machine shops and engineering services, especially the Engineering Department, was support of the manufacture phonographs. The Engineering Department was charged with improving details in design effect more economical manufacture. Kellow remained charge the business affairs the lab, including billing, scheduling, and accounting, and Constable was ordered give him full cooperation." This information was needed for modern manufacturing methods using interchangeable parts, and was the responsibility the Engineering Department keep the drawings and specifications up-to-date