BENNING produkty

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Usměrňovačové systémy DC-Měniče Střídače UPS systémy ...

Vydal: BENNING CR, s.r.o. Autor: BENNING

Strana 193 z 247

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
Now, probe calib ­ tion has been done successfully. elect the onth from the list and choose the corresponding year eans the rro buttons -^> , <► >). / C ai. 08/ 2012 .000 A). C onn ect the connecting cable (test cable) the yello onde robe" and the green al. robe alib ratio and confirm essage ith <Yes>.2010________ Press the button open the "calen dar vie select the onth and the year directly. his calibration necessary, because the resistance the ca­ ble ill taken into consideration for the easuring result the protective cond uctor resistance m easurem ent! calibration data ill saved perm nently the device.' I-I P. A balance calib ration necessary, standstill ith issing signal the displayed m easured value are not proxim ately (e." ck. 0. During calibration, connecting cables the test sam ple other cables ust connected to the device! The device shall calibrated the anu facturer's certain tim intervals (see chap- ter ain tenance alibration").'l S 25 31 1 7 8 14 15 171IS 21 22 28 1 7 Today: 18.g.02. G "Setup election" enu and press alib ratio >.BENNING ,± ±___±1,<1 Fabmar F P. set the tim select respectively and set the value eans the arrow buttons -^> <►>)• 7. For this, the start enu and press etup>, alib ratio Then, press <ZE alance> and pressing <Yes>.7 alib ratio ystem alib ration Probe calib ration (com pensation test cable): epe nding used, probe should calibrated again