ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 453 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
1 3. It should noted that the reference current for the PR122/P the (the rated current defined the front Rating Plug) and not the (the uninterrupted rated current the itself).13.2. The unit opens the circuit-breaker which installed means the TC, which takes effect directly the device's mechanical leverism. 2 Page No. Model 2234 Apparatus Scale L 2778 Doc. Example: the E1B800 with 400 Rating Plug has 800 and 400 A.1 rd The PR122/P has been designed work accordance with the international standard: IEC 60947-2 voltage apparatus. The protection unit self-supplied current sensors and primary voltages the PR120/V module installed. The unit's user interface also enables parameter setup and complete the prealarm and alarm management for the protection and watchdog functions. The unit made using digital microprocessor technology and interfaces with the user means graphic display and keyboard. Circuit-breakers. 42/158 .6 13.1 General The PR122/P high-performance self-supplied protection unit with Protection, easurem ent, Data storage, unication (optional), Self-test, Load control and Zone selectivity functions for the ABB SACE 'Emax' range and 4-pole low-voltage air circuit-breakers. No. SACE PR122/P Release Identification The PR122/P units available, accordance with the IEC standards, together with the various protections and the various standard and optional modules, are illustrated the following figure: m PR122/P For all versions o® Optional modules available PR120/V MEASURING 0 PR120/D-M COM PR120/K SIGNALLING PR120/D-BT WL-COM BT030 Rc(1) Note (1): See par.2 cifica tio s 13. 16. The protections available are: S bol Protection against L overload with inverse long time delay S short-circuit with adjustable delay I instantaneous short-circuit G earth fault with adjustable delay U phase unbalance OT temperature out range M closing short-circuit The PR122/P can installed 3-pole CBs with and without external neutral, 4-pole CBs