ABB Vzduchové jističe EMAX E1-E6 Montážní návody a manuály (03)

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 169 z 660

Vámi hledaný text obsahuje tato stránku dokumentu který není autorem určen k veřejnému šíření.







Poznámky redaktora
After the assembly, tighten the bolt with torque Nm. The connections must not exert any strain the terminals any direction. conductor with cross-section conforming current standards must used for the connection. Always use two wrenches (so not strain the insulating parts excessively), applying the tightening torque indicated Fig. The terminal box identified code the electrical circuit diagram. 12).3. 19 Model 3447 A pparatus Emax DC S cale D 1SDH000635R0002 Page No. Check tightness after hours. When copper connections are used, advisable tin-plate the contact surfaces. 5.Check the state the contact surfaces the connections very carefully: they must very clean with burrs, dents traces rust which must be eliminated using fine file emery cloth prevent localized increases temperature. Make the contact between connection and terminal and tighten the fixing screws completely.2 arthing The fixed circuit-breaker and the fixed part the withdrawable circuit-breaker have one two terminals the rear, marked with the special symbol, for connection earth (Fig. Before assembling the connection, clean and degrease the area around the screw. s fo l E3 3 E6 6 Fig. and Fig. 11/108 . Each terminal complete with bolt for fixing the connection.1 Interfacing elements for fixed circuit-breakers A special terminal box provided, fitted with screw terminals for connecting the auxiliary circuits. scre s fo l E2 2 E4 4 No. When aluminium connections are used, advisable apply thin layer Vaseline over the contact surfaces.3 iring circu it-b xilia circu its 5. The terminals are marked with alphanumerical identification codes for the electrical circuit diagram.1. Always insert large-diameter flat washer and spring washer between them (to spread the tightening pressure over greater area).2 Assembly procedure for the connection busbars M12 high strength screws Tightening torque the main terminals: Nm No. 5. completion the operation, remove all traces of grease dust with cloth soaked suitable solvent. The terminal box immediately accessible when the compartment door open. Fig. 18. 18 5