ABB Softstartéry - opravy, náhradní díly (EN)

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Vydal: ABB s.r.o, ELSYNN Autor: ABB ELSYnn

Strana 63 z 79







Poznámky redaktora
(table 1or 2) 8. After pressing Next when the parameter PST(B) set, the programming complete.Configuration the LVboard If only the board changed, the softstarter ready start. Set the parameter ByPass AC3. Set the required display language. 1. (table 2) 9. Press Store save the value and press Next continue. Every softstarter size has its own parameter values for the board according table that must used. Set the parameter Int ByPass. (table 1or 2) 10. Enter the menu Service settings using following path: Menu SETTINGS Service Settings New PCB and press Select 3. (table 1or 2) 7. Follow the step step instruction below this set-up. Switch the power supply (terminal 1and 2). 5. 11. the board changed, a programming this must done before the softstarter can taken operation. For set-up Torque Control during start and stop see separate manual sheet update manual. 2. Set the parameter PST(B). (table 2) 6. If wrong language was selected press Back for previous level. These commands are valid for the whole set-up. -. Set the parameter Ratio Ir. Set the parameters SOP1 SOP4. Before taking the softstarter operation, don’t forget set the rated motor current and activate the required protections, warnings, input outputs etc. 12. Press Yes the question “Are you sure?” 4