• Test by-pass function, and that indication the unit correct. • Programming. • Function test start ramp and stop ramp. The test voltage may not connected until the test object connected. Do not apply test voltage before the test object connected. Test between the phase and earth: 2,7 during 1s. • Function test the keypad and display. • Voltage test control circuit, 1,0 during 1s. The number combination the stamp stands for ”year” and ’’calendar week” production and testing. Also check that indication correct the unit. Between connection block 1,2,12,13,14,15,16,17,18,19,20 and earth. Test between the phases: 1,4 during 1s.Check that the circuit board and fan voltages correspond with the manufacturing specification and the rated marking plate. J I M IP ABB Automation Technology AB, CEWE Control S-721 Vasteras, SWEDEN Telephone +46 00 TELEFAX +46 01 -. Delivery • Each completed and tested softstarter delivered with installation maintenance manual. Tripping current mA. • Test stamp green area label right hand side the softstarter. • Voltage test main circuit: Tripping current mA. • Visual check the completed product