Poznámky redaktora
3.
□ itia set-up ith ATS010 not pow ered and ith irc breakers the
open position.
□ circu breakers that can ith draw removed: itch pow supply
to the otor operators con trol coils, place circu breakers the
w ith sitio and then return them the connected position.5). How ever, it
is not advisable start operations ith the positions the regulations.3).
□ axim and inim voltage
□ Tim delays
N lly these settings can ifie after the has been set up.
A trim side panel (see 3.
I fnormal line voltage ispresent without anomalies, the green LEDS L1,
L2, R,S,T are (in single-phase operating mode only green LED
L1 on).
I alarm device present, stopsfunctioning.
A the end fthis sequence, only the Power LED (green) remains on.
The two breaker LEDS remain off.
I not, see Trouble-shooting guide (5.
□ Pow the ATS010.2.
5. Set-up
F llo this procedure lets set the and, the same tim check that
in sta lla tion has been carried out correctly.
With selector this position, the unit will keep the circuit breakers
open during set-up.
All LEDs thefront panelflash briefly and then sequence.
Warning: the alarm signal contact closed!
□ Set the selector norm-emer.
ABB SACE SACE ATS010 RH0202002 L2467. OFF.
A fte each step, check that the expected result achieved.perating voltage
Single-phase: select value voltage between phase and neutral
Three-phase: select value phase neutral voltage
□ itching strategy
■ otor operators con trol coils) are pow ered directly fro the
norm and gen set lines, select strategy only