Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 69 z 288

Jak získat tento dokument?






Poznámky redaktora
Metal roofs fulfilling the requirement IEC/EN 62305- 3 regarding material strength can used natur- al air-termination and down-conductor unit. contrast, loose conductor routing must installed secure the temperature- dependent length compensation. Kalzip® terminal, able carry lightning current, from OBO TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 69 Chapter The external lightning protection system . The application standard offers variety options in this regard. Tested ter- minals must used create fixed connection able to carry lightning current. Depending the product, these can be fitted the roof element standard- compliant way.6).TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 Possible method for connecting metal roof parapet bridging with flexible cable Various bridging and connecting components are available for connecting metal roof elements (e. Metal covers protect the exterior wall can used as natural component the air-termination system, if melting the impact point the lightning strike is accepted (Table 2. parapets) such way that they can conduct light- ning current.g