Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 27 z 288

Jak získat tento dokument?






Poznámky redaktora
In Germany, the master cable installation guideline (MLAR) was introduced technical construction regulation the applicable construction law the German federal states. Additional construction regulations spe- cify which construction measures must applied. However, with regard to fire protection, only the technical systems are de- scribed here. Thus, the protection aims according the construc- tion regulations are implemented practice. Austria, the cable systems dir- ective dealing solely with the electrical installation is called ÖVE ÖNORM 8002. The building must have been erected already described the gener- al requirements, order "prevent the creation of fires and the spread fire and smoke, and allow the rescue people and animals well effective ex- tinguishing measures". These are specified by, for example, VDE, ÖVE, KEMA-KEUR and others. applies electrical, sanitary and heating cable systems, but not ventilation systems. According them, construc- tion project "arranged, erected, modified and maintained such way that public safety and order, and particular life, health and natural requirements for life, are not endangered". This sets three important pro- tection aims. Fire protection the construction regulations The first fire protection requirements are, for example, defined §14 the German MBO. Guidelines for electrical installations Besides the basic national requirements from con- struction law, there are also the electrical require- ments. This means people, an- imals and property and their surroundings. The MLAR applies installations emergency routes, cable routing through separating walls and ceilings well systems with electrical integrity in the event fire.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 General requirements Construction regulations place basic requirements on a construction system. Depending on the area concerned, the responsibilities lay with the planner, craftsperson and operator. Schematic drawing the increasing requirements for fire protection measures, depending the building type and size TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 27 Chapter General introduction . There are similar regulations directives other European countries, which are dedicated the topic fire pro- tection buildings. This directive specifies the requirements for installa- tions building